- Site map showing location of structure – aerial google map will work as long as it is in color and clear.
- Clearly mark where structure will be on site map.
- Dimensions to the home (10') or commercial building (25’) and each property line (3’)
- Pamphlet or brochure of structure - if you are purchasing it.
- Framing details and material list - if you are building it.
- Carport – if connected to home - need to know how.
- If pouring a slab for structure, we will require same items as flatwork (see Flatwork/Driveway/Approach below) – concrete must not be in any utility easement.
Residential:
- Site map showing location of structure – aerial google map will work as long as it is in color and clear.
- Clearly mark where fence will be on site map.
- What is the material of fence – chain-link, cedar pickets ornamental iron?
- 6’-8’ in back – front can only be 4’ and every other picket must be removed for visibility.
- Site map showing location of structure – aerial google map will work as long as it is in color and clear.
- Clearly mark where fence will be on site map.
- What is the material of fence – chain-link, cedar pickets ornamental iron?
- Residential – need square footage and what type of material it is.
- Commercial – need an asbestos survey.
- Please allow 24 hours after permit is issued to start work. The City Inspector will need to check on the utilities to make sure nothing is on at the property.
- Site map showing location of work – aerial google map will work as long as it is in color and clear
- Clearly mark where flatwork will be on site map
- Dimensions to any buildings and each property line
- If connecting to existing concrete, how will it be connected
- PSI of concrete, rebar size, length, width depth of concrete, 12” on center
- All approaches require approval from Public Works
Homeowners can pull the appropriate permits on property they own and have a homestead exemption on.
- Mechanical: Seer rating if replacing a full unit (State License Required)
- Electrical: Amperage, Feeder Panels, outlets, etc. (State License Required)
- Plumbing: (State License required)
- What are you replacing?
- Water Heater - How many gallons, and is it electrical or gas?
- If replacing backflow – where are you replacing it?
- Must have stamped signed drawing of zones (State License Required)
- Backflow location and is a separate metered needed?
- If in Historical District – provide photos.
- If commercial, we will need an asbestos letter showing no asbestos on roof.
- Site map showing location of sign if on ground – aerial google map will work as long as it is in color and clear.
- Where will sign be placed? – if pole or monument we need distance from property line to outer edge of sign.
- Rendering of what sign will look like.
- If pole sign - need overall height.
- Dimension of sign?
- Dimension from bottom of sign to ground if it is a wall sign – minimum 10’.
- How many signs are you permitting?
- How many signs are already there?
- Is it illuminated?
- Site map showing location of where pool will be – aerial google map will work as long as it is in color and clear.
- Dimensions to the house and each property line -must be a minimum of 5’.
- Show location of fence around pool – must be 5’ for residential and 6’ for commercial.
- Back door must have an alarm.
- Self-closing and self-latching gate?
Anything over 2’ must have engineered stamped drawings.
- Site map showing location of where wall will be – aerial google map will work as long as it is in color and clear.
- What material will be used?
- Site map showing location of where solar panels will be on roof or ground – aerial google map will work as long as it is in color and clear.
- Schematic’s on solar panels.
- How much of estimated cost is electrical portion of total?
- Who will be the electrician?
- Stamped signed letter from Engineer that roof can withstand the extra weight of the solar panels?
- Site map showing location of structure, measurements, utility placement, parking (commercial)
- List of all contractors for the project including any state licenses and company information
- Building plan: Diagram of the structure including electrical placement
- Res or Comm check (check energy efficiency)
- COMMERCIAL BUILDING ONLY: Over $49,999 must be registered with the Texas Department of Licensing and Regulations before a permit can be issued
- COMMERCIAL BUILDING ONLY: Over one story or 5,000 square feet or if spans over 24 feet it must have an engineered plan
- COMMERICAL BUILDING ONLY: Knox box is required
- Building plans showing existing floorplan and building plans showing the new floorplan after the remodel
- Detailed scope of work
- List of all contractors including any state licenses and company information
- Asbestos survey required (COMMERCIAL ONLY)
- Knox box required (COMMERCIAL ONLY)
- COMMERICAL ONLY: If remodel is over 5,000 square feet engineered plans are required
- COMMERICAL ONLY: If remodel is over $49,999 you must register with the Texas Department of Licensing and Regulations before a permit can be issued
If you have any questions, please contact the Permit Technician or the Building Official. Permits can be applied for online.